West Campus Irrigation Service Extension (2013)


Picture 1  
Left Arrow
Right Arrow
Laying Pipe Parallel to South 11th (in grass next to Brick Breeden)South Fieldhouse Parking LotCrossing KagyNE of Eleventh and Lincoln IntersectionRoskie Hall Parking LotDistribution from Tunnel to Johnstone Center (located Between Chemistry Biochemistry and future Jabs Building)SW of Paisley Court: Valve to Community GardenGarfield StreetHapner HallIrrigation Main between Koch and Story TowersLaying the Pipe next to Garfield

 

The irrigation project is an extension of the non-potable irrigation system to several residential areas of campus including Family Graduate Housing. This project dramatically reduces the amount of potable City Water used for irrigation and materials used in the project should reduce maintenance and repair costs to the distribution system. The project will save about $ 110,000 annually in direct water costs and equates to a water savings of over 24 million gallons or roughly 1% of Hyalite Reservoir. Perhaps more importantly these potable water savings are now available for all current and future City of Bozeman water utility customers.