Stadium End Zone Project


MSU Stadium

The project included replacement of existing East end zone bleachers with new stadium type seating. The end zone capacity increased by 5,200 grandstand seats to a total of 7,200 seats. The student section increased by 1,100 seats. The overall capacity is now over 17,000 seats. The project also included new restrooms, new concession stands, and a new visitor locker room. The total project cost was approximately $10 Million. The new score board and state of the art digital screen was designed by Advanced Electronic Design of Bozeman, MT.

Consultant: Contractor: MSU Contact:
A&E Architects Martel Construction TBD