STADIUM TURF INSTALLATION


Stadium

The stadium turf installation project began in the spring of 2008 and was completed in August of 2008. This project was realized through fundraising and working with the MSU Foundation to establish the funding needed to complete this exciting project.

The turf was installed in Bobcat Stadium and will be primarily used by the MSU Bobcat football team for home games. The maintenance of the surface will be coordinated through Bobcat Athletics. The new turf was ready to use for opening home game in 2008.

Architect: Contractor:
Engineering, Inc. FieldTurf USA, Inc.