STANDARD EIGHT:
PHYSICAL RESOURCES
INTRODUCTION
Montana State University - Bozeman (MSU) was the first of the state.
s public institutions of higher education. MSU was established
as a Land Grant Institution on an original forty (40)-acre site
purchased from the City of Bozeman, adjacent to the city's "county
poor farm" during a time of national economic depression. One of Bozeman.
s founding fathers bought the poor farm and donated the land for the
college. The state legislature refused to appropriate funds for building or
operating costs even though the federal government had mandated dates to begin
instruction in order for the school to receive Land Grant Funds. This required
that the first classes be held in rented facilities in downtown Bozeman, funded
personally by local business leaders. The Land Grant Act did fund the
instruction, but no buildings or land. The first building on campus was, appropriately, the agricultural
experiment station, funded by the Federal Hatch Act, again without state
support. And so the tradition
continues. [See Exhibit 0.01, In the
Peoples Interest: A Centennial History of Montana State University]
The original vision for the school required resources of land
and buildings. The campus has developed into a complex combination of academic,
research, auxiliary, and support facilities. It is located in a beautiful
mountain valley and dynamic community, accessible to international
transportation and unlimited recreation resources.
The physical facilities and property of the university have
steadily grown over the history of the institution meeting the expanding needs
of research, teaching, and outreach. Recent renovation and capital construction completed since the last NASC visit
extend the university's infrastructure in support of the institutional
mission. Facilities highlights to be
discussed in more detail include:
· Over $172,000,000 in capital construction since 1990
· Increase in classroom space from 112,000 to 126,000
square feet, a 12.5% increase
· Increase in gross square footage of 330,000 square
feet, an 8% increase
· Completion of the campus-wide utility tunnel project
providing utility and communications access for the next century
· Completion of two (2) major academic and research
buildings, the Engineering/Physical Sciences building (E/PS) and the Ag
BioSciences building
· Renovation of the steam and heating plant
· Central reclamation of the campus mall and other
aesthetic improvements
· Construction of an irrigation reservoir, making the
campus independent of city supplies
· A refocusing on the academic mission of the institution
THE CAMPUS CORE
MSU has a central core of thirty-six (36) major academic
buildings, sixty-one (61) major auxiliary buildings, and 134 individual housing
units located on approximately 1,170 acres, of which fifty (50) are a part of
the main campus. There are
approximately 2,565,000 gross square feet of academic space and 2,060,000 gross
square feet of auxiliary space on the central MSU campus. The major buildings have a value of more
than $525 million. The Agricultural
Experiment Station (AES) facilities are valued at over $13 million. In addition, capital equipment has a value
of $85 million. These figures do not include land, books, livestock, roads,
parking lots, or utility infrastructure. [See Exhibit 8.01, 1999 MSU Property
Appraisal.]
THE OUTLYING CAMPUS
CORE
AES properties are located throughout the state in eight (8)
distinct and geographically dispersed locations. These facilities have resident staff who manage the facilities
and research programs which are located close to the following towns: Moccasin,
Sidney, Miles City, Havre, Creston, Huntley, Corvallis, and Conrad. Three (3)
other facilities are close to Bozeman: Fort Ellis, Post Agronomy Farm, and the
Red Bluffs Ranch, which are operated by campus staff in the Animal and Range
Sciences. There is also a new
horticulture farm immediately west of and adjacent to the central campus. Most of the Ag station facilities are
ranching and farming operations, and the managers have done a commendable job
of retrofitting the existing facilities to accommodate the programs.
All of the AES's have their own unique challenges. Havre,
located on the National Historic Site of Fort Assiniboine, is an example of the
difficulty in running a research station while complying with the mandated preservation
requirements and concerns of the historic preservation community.
Most of the Ag station buildings are in a constant state of
needing maintenance and/or renovation. There is little funding for operations
and maintenance. Many of the facilities
are not adequate to support the programs. The stations at Huntley, Moccasin,
and Havre have the most severe needs. There is presently no systematic means of funding repair, maintenance,
or renovation on these stations. It
appears that this funding situation will not change in the foreseeable future.
The University also maintains nursing programs in Billings, Great
Falls, and Missoula. The Billings program is housed on the MSU. Billings
campus in a recently renovated facility. The Great Falls program is moving into
newly renovated space at the Great Falls College of Technology. The program in
Missoula is on the University of Montana (UM) campus, but is administered
through MSU. Physical space at each campus is adequate to
meet the program goals, and there are sufficient offices for faculty and staff,
classrooms and conference rooms, computer assisted instruction, and
skill/practice laboratories to meet instructional needs. A review of these facilities was recently completed
in the CCNE Accreditation Review of the College of Nursing [Exhibit 2.115,
College of Nursing Self-Study; and Exhibit 2.116, College of Nursing Self-Study
Appendices].
INSTRUCTIONAL AND SUPPORT
FACILITIES
CAPITAL
IMPROVEMENTS SINCE 1990
Most major buildings on the MSU campus
serve as multi-use facilities with space for faculty, staff, students, and
classrooms. The lecture halls and many classrooms are equipped with multi-media
capabilities and have new smart podiums. to allow teaching with the newest
technology. The change from traditional teaching methods to high technology has been
generally well-received. Maintenance and upgrading procedures for
equipment are periodically reviewed to incorporate the newest technology. This
work is all coordinated through the Information Technology Center (ITC).
During the past ten (10) years, the MSU
campus has experienced construction at a scale and pace not seen since post
World War II. There have been over 1,000 construction projects at the cost of over
$172,000,000 since January 1990. Approximately 30% of the projects have been
state funded with the remainder supported by Auxiliaries, research grants, and
private donations [Appendix 8-A, Construction Query from January 1, 1990 to
January 1, 1999].
Numerous buildings and facilities have had
comprehensive studies, extensive renovation, or new construction since 1990.
These are detailed in the Appendix 8-B, Capital Improvements Since 1990.
Comprehensive information regarding these new construction projects, including
contract documents, renderings, photographs, and models, will be on display in
the Exhibit Room. [See Standard Eight List of Exhibits.]
Unfortunately, the state has not kept up
with funding for maintenance and repair of our existing facilities. The current
accumulated deferred maintenance on the MSU campus exceeds $59,000,000.
There has been steady growth in students
and academic endeavors at MSU over the past ten (10) years with an increase of
classrooms and general building gross square footage. Significant growth in
research has increased the Grants and Contracts (G&C) activities by over
300% in the last decade. As reflected in the 1999 Faculty, Classified
Staff, and Professional Staff Surveys, many of the respondents do not feel that
there are adequate choices for classrooms, and that the existing classrooms do
not have sufficient computer connections for faculty instruction or to meet the
students. needs. It is also felt that AV equipment is insufficient. In addition,
faculty and staff feel that there are not adequate choices for labs/studios to
meet teaching and research requirements, and that the equipment is not adequate
for instructional labs or research labs. [See Appendix 1-K, Faculty Survey; 1-L,
Classified Staff Survey; and 1-M, Professional Staff Survey.]
VOICE-DATA-TECHNOLOGY
Great strides in the delivery of
computing, voice, and data have been achieved over the past ten (10) years at
MSU. These include a major ($10,500,000) replacement of the university's
administrative software system and the shift to Transmission Control
Protocol/Internet Protocol (TCP/IP) as the campus networking standard. This
improvement gives all faculty, staff, and students access to the Internet. There has been a
shift toward UNIX and Microsoft NT as the operating systems for our central
computing system, and the successful completion of an NSF Very-High-Speed
Backbone Network System (VBNS) grant, giving MSU high-speed access to the VBNS
network and to Internet 2.
Even with all the accomplishments, there
is much work to be completed. Many MSU academic buildings are not wired to
accommodate high speed data delivery. The telephone switching equipment needs
upgrading, requiring a major funding commitment. ITC has not received adequate funding to do
the work it needs to do, but it has completed much with the resources it
receives.
ADA-ACCESSIBILITY
In 1990 the University began a
comprehensive self-evaluation for compliance with the Americans with
Disabilities Act (ADA). The majority of this evaluation was completed
by the MSU ADA Compliance Officer and Director of the Resource Center/Disabled
Student Services. Their evaluation and transition plan brought the University into
compliance with ADA in providing accessibility to every program on campus. MSU maintains a
Disabled Student Services Department which resides within the University
Resource Center. [See Exhibit 8.02, MSU ADA Self Evaluation and Transition Plan;
and Standard Three, pp. 172.] The Office of Facilities and Services (OFS)
architectural staff has researched and designed numerous projects to address
many ADA needs.
The University continues to evaluate
buildings for accessability. Decisions regarding remedial work are made by
the University Planner in conjunction with the Director of the Resource
Center/Disabled Student Services, the ADA Compliance Officer, and the University
Architect. These individuals, with input from numerous MSU students with various
disabilities, also develop the overall philosophy and operation plans for
accessibility, identify and prioritize remedial work to be completed, and review
proposed construction projects for appropriate design. Even though the
University complies with the ADA making all programs on campus accessible, the
individual facilities often do not meet the ADA. The University Planner has completed a
comprehensive site and building evaluation of facilities that have ADA
deficiencies. These deficiencies are prioritized and submitted bi-annually to the
Montana Legislature for funding. Unfortunately, MSU received no funding for
ADA or Life/Safely projects this past legislative session.
FUNDING
Auxiliaries construction
The funding of capital construction
projects is financed in various ways. Projects for Auxiliaries such as the
dormitories, food service, and the Student Union Building (SUB) that are
revenue-producing facilities are financed through income generated by those
facilities. Smaller projects are financed directly from renewal and replacement
accounts, and larger projects are bonded, and ultimately paid, by income
generated from the use of these facilities.
Recent projects include the construction
of dormitories provided for specific student populations, and the renovation of
various food service facilities. Based on user surveys and input, these
renovation and construction projects maintain the university's ability to meet
the needs of students and staff.
Research construction
Many projects are financed through Federal
and/or corporate research grants for a specific research project and principal
investigator. The renovation of these facilities is generally a part of the grant
received. In
addition, Federal funding from the Department of Agriculture financed the design
and construction of the new Ag BioSciences building.
Special projects
In addition, numerous projects are funded
in part by private donations. These funds typically are raised through the
MSU Foundation, or by individual departments. One example of this type of
project is the reclaiming of the central campus for the Centennial Mall.
Maintenance
Maintenance includes all activities
necessary to identify, fund, design, and select materials and methods for any
given project. Maintenance also manages the budget for upgrading, repair, and
replacement projects for buildings, utilities, landscape, grounds, etc. Maintenance is
funded through the state General Fund for the Facilities Services Annual
Operating Budget. Maintenance can be divided into the following categories:
· Building maintenance. The
systematic activities necessary to maintain, upgrade, repair, and replace
building components, systems, fixtures, and furnishings damaged through normal
usage and the passage of time.
· Preventive maintenance. Regularly scheduled
maintenance necessary to reduce down time, minimize breakdowns, reduce
accidents, and prolong the life of buildings, systems, fixtures, and
furniture.
· Major maintenance. Longer term
repairs, replacement, and corrective actions to preserve the on-going integrity
of the physical plant and to appropriately manage the capital assets of the
institution. Major maintenance projects become deferred maintenance when they remain
unfunded.
· Classroom maintenance. Repair and
replacement of furniture, fixtures, and accessories (chalkboards, projection
screens, microphones, amplifiers, desks, seating, tables, and window coverings)
to maintain the classroom environment.
· Scheduled maintenance.
Programmed maintenance projects for future repair and replacement needs which
maintain and/or upgrade the condition of facilities and systems. These are typically
smaller scale projects and are not included in major maintenance.
Long Range Building Program
Each biennium, the University submits a
comprehensive Capital Construction Program or Long Range Building Program (LRBP)
to the state legislature [Exhibit 8.03, Long Range Building Program]. This submission
requirement is only part of the continuing effort of on-going planning. This program
includes MSU's needs along with all the other units of higher education. All needs are
prioritized by the Board of Regents (BOR). MSU receives its share. of funds for code,
life safety, and ADA modifications through this process. Funds have also
been received for major roof replacements, the utility tunnel, the Heating Plant
renovations, and the E/PS building through the LRBP process. The appropriate
stewardship of facilities and infrastructure, as well as continued growth in
dynamic academic programs, forms the basis for justifying funding requests. During this
biennium, MSU's top priority was funding for repair, maintenance, and
renovation within the Library. [See Appendix 8-C, 2002-03 LRBP Development
Schedule.]
FACILITIES SERVICES
Mission
The mission of the OFS is to provide an
effective physical environment that supports and enhances MSU in its delivery of
teaching, research, and public service.
Specific components of the OFS mission are
as follows:
· Deliver timely and cost effective facility and support
services
· Provide and maintain the best possible environment for
teaching and research within available resources
· Safeguard the capital investment in the university's
buildings, equipment, grounds, and utilities through the development and
administration of cost-effective maintenance program
· Continually evaluate and administer effective
professional criteria and standards for the design, construction, and
maintenance of all facilities
· Assure effective land and building utilization through a
program of professional, comprehensive facilities planning
Facilities Services consists of seven (7)
service management areas which include:
· Environmental Services
· Administration and University Services
· Maintenance, Operations, and Work Control Center
· Facilities Planning and Management
· Engineering and Utilities
· Architectural Services
· Secretarial Services
The managers of each of these divisions
report directly to the director of OFS, who in turn reports to the Vice
President of Administration. [See Exhibit 8.04, 1995 Administrative Services
Review; Exhibit 8.05, Office of Facilities Services Organizational Chart;
Exhibit 8.06, Position Descriptions for Facilities Services Key Personnel;
Exhibit 8.07, Resumes of Facilities Services Professional Staff.]
Facilities Planning and
Management
The Facilities Planning section budgets,
plans, organizes, directs, and administers the activities of the planning
division. It utilizes the principles and practices of architecture, campus
planning, landscape architecture, and multiple engineering professions. The
different branches work together to define, plan, defend, and implement the
capital construction program, campus planning, facilities renovation, and major
maintenance for the University. This section uses extensive knowledge
of master planning and architectural practices, building codes, construction
costs, construction management, historic MSU and State of Montana precedent, to
interpret users needs, budgetary management, and project management. Facilities
Planning also administers the Facilities Condition Inventory (FCI) audit
process.
Architectural Services
Architectural Services provides technical
and professional expertise required to accomplish construction work necessary to
protect the life, health, and safety of building occupants. It also accommodates
program needs through remodeling, renovation, or maintenance for MSU and seven
(7) geographically dispersed AES facilities. Architectural Services consists of employees
with expertise in planning, project design (architectural, mechanical,
electrical, civil), and construction administration, including registered
Architects and engineers, architectural technicians, computer-aided design and
drafting (CADD) systems manager, CADD technicians, and field project
manager/construction inspectors. Architectural Services is directly
responsible for:
· Architectural and engineering design both in-house and
coordination of work performed by consultants
· Pedestrian and vehicular traffic/transportation
engineering; landscape design
· Production of contract documents
· Project management
· Construction administration
· Archival of building, site, and utility information
· Production and storage of CADD information
Engineering and Utilities
The Engineering and Utilities group within
Facilities provides multi-disciplinary professional engineering services,
technical consultation and assistance, maintenance and operations support, plan
and code review, cost estimating and benefit analysis, and project
administration. It also provides technical operations, maintenance and repair
services to heating, ventilating, air conditioning and refrigeration (HVAC-R)
systems, and specialized lab/research equipment and systems to utility
distribution systems, and to the central steam/co-generation plant and emergency
systems. This group forecasts utility consumption, using profiles and rates;
procures utility commodities in the competitive-market environment; administers
resource conservation and energy management; represents the University in
utility regulatory proceedings; and administers annual utility and operations
budgets of $5,000,000 with $7,000,000 plus of budget activity in state,
designated, and G&C accounts.
Academic support
The Facilities staff pride themselves on
their commitment to the support of academic programs. New construction
and facilities upgrades provide a dynamic set of resources for teaching and
learning. New
computing and pedagogical technologies enhance the ability of the institution to
meet the instructional mission.
Annually, the Engineering division of OFS
collaborates with the College of Engineering and sponsors a senior design
project in an area of need. These projects are related to building
facilities such as an HVAC design/investigation or an energy analysis. The OFS engineers
provide the task to the student team, and work with them throughout the process.
They hold progress meetings, help critique their work at completion, and provide
a feed-back report to the class professor. This gives the students real-world experience
dealing with buildings and mechanical systems, and gives the OFS engineers new
ways to look at continual problems.
Maintenance, Operations, and Work
Control Center
The operation and maintenance of the
university physical facilities is the responsibility of employees skilled in
such trade areas as carpentry, electrical, plumbing, heating, refrigeration, air
conditioning, roofing, locksmithing, painting, glazing, landscaping,
construction, warehousing, and custodial. More than 20,000 work orders are completed
yearly to serve the needs of all departments. Systematic programs are in place for
preventive maintenance, building maintenance, classroom maintenance, scheduled
maintenance, and major maintenance.
In addition, cost estimating, work
scheduling, and job costing systems are used for all maintenance work.
The Work Control Center of the OFS
centralizes the production planning, paperwork processing, estimating,
scheduling, controlling, coordination, evaluation, and follow-up of all
maintenance, service, and project work orders. This area consolidates the responsibility for
controlling coordinating line functions, assessing staff requirements,
determining material needs, and scheduling the activities of Facilities
Services. line service units. This area also serves as a communications
center and focal point for all of Facilities Services. daily activities and
provides centralized professional estimating services for maintenance,
renovation, and new construction activities.
Custodial and housekeeping
The Custodial Services section of
Facilities Services is charged with minimizing the deterioration of inside
building surfaces (particularly floors) and providing a clean, sanitary,
pleasant interior environment to enhance the learning process and facilitate
teaching and research. Custodial Services is also responsible for
providing after-hours building security, keeping the building interiors free
from physical hazards to campus users, removing solid waste from the buildings
to collection containers outside, and sorting and handling materials to be
recycled.
In the Faculty, Classified Staff, and
Professional Staff Surveys, respondents generally rated the housekeeping
effectiveness as marginal to adequate. Major cuts sustained by the OFS state budget
in 1993 produced a reduction in the custodial labor force of 21%. This cutback
necessitated a reduction in the frequency of cleaning of certain building
spaces. Table
8-01 illustrates OFS's self-evaluation of the level of custodial service it is
able to provide, using the Association of Physical Plant Administrators (APPA)
ratings.
| Table 8-01
APPA LEVEL RATINGS FOR CUSTODIAL
SERVICE |
Area |
APPA Level |
APPA Description |
Classrooms, circulation areas,
restrooms, class laboratories |
3 |
Casual attention |
Offices, office suites |
4 |
Moderate dinginess |
Research laboratories |
5 |
Unkept,
neglect |
Compounding this problem has been a
depressed wage schedule for custodians and housekeepers imposed by the state
classified workers. pay plan. MSU has recently been able to correct some of
this problem with an unprecedented group pay exception for custodians. This has
significantly helped in the custodial staffing challenges.
Landscape and Grounds
The Landscape and Grounds section of OFS
is responsible for the following:
· Maintaining the campus grounds
· Implementing campus landscape and grounds
improvements
· Reviewing plans and specifications for proposed
construction projects
· Evaluating finished construction as it relates to such
specifications
· Keeping the grounds free from physical hazards to campus
users, including snow removal
Special attention continues to be paid
towards the landscape and grounds of the campus. The center of the campus was
reclaimed as a pedestrian "mall," including extensive landscaping, walkways,
site furniture, and other improvements. This was made possible by the construction of
the utility tunnel and the generous donations of alumni and friends of the
University. Significant areas of landscaping and concrete sidewalks have been
added campus-wide, all to the betterment of the aesthetic and functional layout
of the campus. These areas, however, all require more maintenance, care, and snow
removal. There
has been some increase in funding for Landscape and Grounds, but the financial
support is barely keeping up with the growth in landscaped areas and
expectations of the campus community.
Facilities Condition
Inventory
MSU developed the FCI that has been
adopted by the State of Montana to evaluate the condition of existing buildings
and establish a solid database for deferred maintenance. Each month a
scheduled building is inspected by a team of architects, engineers, and trades
personnel (electricians, carpenters, plumbers, heating plant). With the number of
large academic buildings on campus, it takes the OFS staff three (3) years to
complete one (1) cycle of the FCI needs assessment process at MSU. Each building is
evaluated with respect to the following:
· Life safety
· Damage/wear-out
· Code/standards
· Environmental improvement
· Energy conservation
· Aesthetic considerations
· ADA
· Renovation/adaptive upgrade
This FCI has provided clear and concise
information to assist the facilities managers in prioritizing deferred
maintenance, the day-to-day management of maintenance resources, and building
renewal and replacement needs [Exhibit 8.08, Facilities Condition
Inventory].
Records management
In 1990 it became apparent that the
management of plans, specifications, and project files was inadequate. Many projects were
filed randomly in cardboard boxes. Blueprints and original drawings were stacked
on the floor in a storage area, and projects were not consistently named or
numbered. A
records manager was hired to implement a system for filing projects. Subsequently, all
information related to construction or remodeling projects was reviewed,
evaluated, and properly filed. One FTE records manager and part-time student
help are required to ensure that this irreplaceable resource is properly
managed.
CADD management
As utility information, building drawings,
and projects are designed and documented electronically, it is imperative to
manage this electronic media. Facilities Services has a full-time CADD
manager that coordinates all in-house and private sector consultant work, and
has established and maintained the CADD standards to be used for all design
projects [Exhibit 8.09, CADD Standards].
Administration and University
Services
The Accounting Department is responsible
for OFS purchasing, accounts payable and receivable, financial accounting and
records keeping, budget preparation and monitoring, and financial support.
The Computing Services department collects
and processes computerized data providing operations support, production
control, hardware and software support, information support, data input and
output control, and user services. Hardware resources include an IBM AS/400
System and Windows NT network servers, supporting fifty (50) plus personal
computers/terminals, plus all associated devices (printers, tape drives, data
collection devices, etc.). The Computing Services department manages all
software systems, providing architectural design, work flow management,
inventory control, data processing, word processing, report generation, and
statistical analyses. Systems supported include human resource systems, barcode inventory
systems, financial resource systems, job cost work order system, facilities
building and room condition inventory, preventative maintenance schedules,
utility metering records, vehicle maintenance records, fuel sales histories, and
capital equipment records. Technical support for these diverse
applications requires in-depth knowledge of how these systems work and
interact.
Motor Pool
The Motor Pool, a self-supporting
department within the OFS, purchases, maintains, and leases a fleet of
thirty-five (35) motor vehicles including vans, Suburbans, trucks, sedans, and a
bus. These
vehicles are available for rental to MSU departments and other state
agencies.
Campus Stores
Supply and capital equipment purchases are
managed by Campus Stores. Campus Stores is self-supporting, generating
income from selling materials to campus departments via Campus Maintenance
workers (electricians, plumbers, carpenters, painters, locksmiths, elevator
technicians, HVAC personnel, grounds keepers, and mechanics), and other supplies
directly to campus departments (office supplies, fine and coarse paper, building
supplies). Campus Stores maintains two (2) inventories valued at approximately
$300,000 located in six (6) storage buildings. In addition, they operate a long term storage
activity, renting storage space to campus departments, located in three (3)
storage buildings.
HEALTH AND SAFETY
Safety and Risk Management
The MSU Safety and Risk Management
department is responsible for developing and administering safety programs,
enforcing occupational and environmental health regulations, managing hazardous
materials, worker's compensation, the ionizing and non-ionizing radiation
safety program, insurance coverages, loss mitigation, and catastrophic event
mitigation [Appendix 8-D, Health and Safety Detail].
Hazardous waste policy
The Chemical Safety officer provides
hazardous waste disposal services for the University, as well as state and
federal agencies affiliated with MSU. The chemical safety program also provides
assistance for compliance with other governmental, environmental, and chemical
regulations. Campus departments are required to treat all surplus chemicals and
chemical wastes as hazardous materials for collection and disposal by the
Chemical Safety Officer. This procedure reduces inappropriate disposal
via the sewer system and the landfill.
Fire/Life Safety policy
The Fire/Life Safety Officer is
responsible for developing, implementing, and maintaining campus fire/life
safety programs. These programs include, but are not limited to: personnel training in all
areas regarding fire safety and awareness, inspecting fire safety in all
buildings on campus, assuring that all fire suppression and warning systems are
in compliance with current standards, developing effective emergency response
plans, and maintaining a close working relationship with the local fire
department. Life safety and property protection are the two (2) foremost
priorities. All programs are periodically re-evaluated for the benefit of the campus
community.
Radiation Safety policy
The Radiation Safety Officer is
responsible for ensuring that individuals working with radioactive materials or
radiation producing equipment are monitored for and protected from physical
exposures to radiation. Federally mandated limits to occupational
radiation exposures are enforced.
Occupational Health policy
The Occupational Health Officer is
responsible for:
· Safety training
· Health screening of specified employees
· Promoting a safe and healthy work place
Occupational safety regulations are
enforced by the State of Montana, Department of Labor and Industry, in
compliance with federal Occupational Safety and Health Administration (OSHA)
regulations. The Occupational Health Program also prescribes and provides a large
portion of the safety and protective equipment required by employees performing
tasks for which personal protective equipment is mandated.
EQUIPMENT AND MATERIALS
PROPERTY MANAGEMENT
Property Management is responsible for the
control of inventory of all capital equipment costing $1,000 or more. All such equipment
is invoiced, inventoried, and tagged with a property management number that
locates and identifies the item within a department. Each item is
described by manufacturer, brand, model, serial number, location, and
department. Inventory reports are sent to all departments every year for review,
corrections, changes, additions, or deletions. Property Management is also responsible for
the disposal of unwanted, unusable, or unneeded capital equipment. Property Management
advertises surplus and give-away items, assists departments in the sale or
trade-in of equipment, and disposes of broken and unusable equipment. Approval is
obtained through the State Property and Supply Bureau for disposition of all
equipment. In
addition, equipment records comply with state regulations. Property Management
assists each department in keeping accurate equipment records. [See Exhibit
8.10, Property Management.]
EQUIPMENT AND FURNISHINGS
The task of keeping up with academic
equipment is an overwhelming challenge. The condition of science teaching
laboratories ranges from state-of-the-art to poor and even dangerous. The chemistry and
biology labs are some of the oldest and in the poorest condition. There have
been minor renovations over the past few years, but limited work has been
accomplished in the teaching labs.
A student computing fee is assessed to
each student and generates funds specifically for lab equipment, computers, and
support. A campus committee of students, faculty, and staff make recommendations
for the use of these funds. The computing equipment for students at MSU
is above-average and well-maintained.
Equipment for research is funded, almost
totally, through grants. The equipment in research labs is often the
best available, even though the space the researchers occupy may not be
adequate.
As the budgets for construction of new
buildings continue to be underfunded, and the budgets for equipment and
furnishings continue to be inadequate, these elements are left out of some
projects all together. This has resulted, in some cases, in new
buildings with old and/or salvaged fixtures and furnishings. The replacement and
repair of furnishings is haphazard.
PHYSICAL RESOURCES PLANNING
GROWTH
Student growth at MSU has been steady over
the past ten (10) years, growing from 10,400 in 1990 to 11,750 at the beginning
of 1999. This growth trend is expected to continue at a moderate, yet constant
pace. The
reputation of selected educational programs within the University continues to
draw international students, as well as those throughout the region. The challenge is to
provide quality facilities to accommodate this growth. In the past ten
(10) years, the University has been able to increase its physical assets to
support academic and research programs by over 330,000 new square feet. This takes into
account the removal of obsolete buildings (i.e., Ryon Lab and one (1) USDA
Lab).
There has been an increase in the total
number of classrooms from 112 to 126. Many classrooms have been supplied with
"smart podiums," however, many classrooms do not meet the needs of faculty and
students. There is an increasing need for classrooms to accommodate fifty (50)
to sixty (60) students, and there are only four (4) large lecture halls on
campus seating from 250 to 350 students. Many classrooms lack the flexibility to
support new and changing types of instruction, and some lack the technology
necessary to deliver state-of-the-art instruction. Numerous classrooms
have been converted to meet the increasing demand for computer classrooms,
removing general classroom space. The space available in the Library is not
adequate to meet the needs of an institution of this size (see Standard Five,
pp. 223-224).
Food service and other services in the SUB
are functioning beyond their intended limits. Students, faculty, and staff have
to stand in long lines for food, to buy and return books at the bookstore, and
obtain other services. The bookstore is looking at options for
renovation and better merchandising. The SUB has completed a comprehensive space
utilization analysis to assist in further planning. [See Exhibit 8.11, SUB Space
Study.]
SPACE UTILIZATION
In 1996, all spaces on campus were
physically checked, inventoried, and the data on each individual room was
updated in the computerized Facilities Inventory data base. This information
provides a basis for a future comprehensive space utilization study. All floor
plans are currently in the process of being updated to accurately reflect the
layout of each building. The University Planner has visited other
institutions to gather information about individual space inventory processes,
and has also attended national space inventory seminars. A proposal is being
developed for consideration by the President's Executive Council (PEC) regarding
an extensive space utilization study. The SUB is the only facility that has had
comprehensive space utilization studies completed to date.
One way to deal with dwindling facilities
resources is to become more efficient in the use of the existing
facilities. Opportunities for improving efficiency include improvements to existing
space and acquiring needed maintenance funds for existing buildings. Most space
is managed by individual departments, with the exception of registrar-controlled
classrooms. Space utilization and efficiency data are now being collected. Future
space needs are being projected for budget requests. Space will be
assigned when available and reassigned if it is not being efficiently utilized.
The administration of space should reflect the philosophy that an individual
does not own space, space is not an entitlement, space is not free, and each
occupant is expected to use space well. Currently, there is no accurate way to
make these determinations. [See Exhibit 8.12, Facilities Inventory.]
MASTER PLANNING-CAMPUS DESIGN
GUIDELINES
MSU has documented master plans for campus
development since the founding of the University. The early master plans were based on a formal
site plan which included a core of academic buildings and agricultural
facilities including numerous barns and open areas. These early master
plans were abandoned during subsequent expansions of the campus. In 1982, the
first phase of an updated planning process was begun by Facilities Planning and
Management (former title for OFS). The resulting documents analyzed growth
trends and changes in the university academic program, identified elements for
future studies, and recommended establishing guidelines for campus
development. Since 1982 it has become apparent that a traditional, single 'master
plan' does not provide the flexibility needed to direct the growth of the
University.
Campus planning is directed and
recommended by the University Facilities Planning Board (UFPB) under the
direction of the President [Exhibit 8.13, University Facilities Planning Board].
The UFPB is a diverse group including the Director of Disabled Students, the
Director of theAES, the Director of Auxiliary Services, the Director of
Facilities Services, the University Planner, and representatives of the Vice
President of Administration, the Vice President of Research/Creative Activities,
the Vice President of Student Affairs, the Provost, students, classified
employees, professional employees, and the faculty. The goal of the
UFPB is to ensure a campus environment which nurtures and develops the
sensitivity of the individual, develops spatial awareness, and provides value to
society.
In 1996, the President and UFPB determined
that guidelines were needed to direct growth while allowing for maximum
flexibility. An intensive two (2)-day charette workshop was held to discuss new
construction, improvements to the campus, recommendations for new projects, and
guiding principles for planning. As a result of this charette, a two (2)-year
effort was undertaken by UFPB to write the MSU Campus Design Guidelines. This document is
the result of extensive research with input from constituents including faculty,
staff, students, the City of Bozeman Planning staff, the Gallatin County
Planning Department, and private sector architects, and planners. The purpose
of the design guidelines is to facilitate growth and development in a coherent,
sensitive, and dynamic manner.
All construction and planning projects are
brought to the UFPB for review, input, compliance with the Design Guidelines,
and a recommendation is made to the President, who ultimately gives final
approval on all projects. UFPB meets every other week on a year-round
calendar. The
Campus Design Guidelines provide the standards for meeting the demand for new
facilities, upgrading existing facilities, and the development of campus
facilities resources [Exhibit 8.14, Campus Design Guidelines; and Exhibit 8.15,
Campus Master Planning Charrette Report].
LIGHTING STUDY
A comprehensive outdoor lighting study was
completed in 1990, and since that time over $2,000,000 has been invested in the
complete relighting of the central campus. This has resulted in a well-lit
central campus and more efficient energy consumption [Exhibit 8.16, Campus
Lighting Study].
CAMPUS OPEN SPACE STUDY
In 1995, the OFS funded an in-depth Open
Space Study of several of the more important open spaces on the MSU campus. This study
established a format for evaluating the spaces, examined the general
relationship of open space to use and activities, and addressed the value of
open space. Suggestions and comments were solicited from the entire university
community. The
goal of the study was to identify open spaces and to give direction for the best
utilization of university property. [See Exhibit 8.17, Campus Open Space
Study.]
PARKING STUDY
A comprehensive study of parking at MSU
was completed in 1997 and provided recommendations for improvement. Some of
these recommendations have been implemented. The student government provides
regularly scheduled shuttle busses to several areas within Bozeman, although
this bus service is not well utilized. Sufficient parking exists to accommodate
faculty, staff, and students; however, many users feel that the parking lots are
not located close enough to the central campus. The northeast sector of campus has very
limited parking with no remaining land to build parking facilities. Extensive lighting
has been installed in the parking lots to provide for greater safety at night.
Parking lots south of the Johnstone center and at Antelope Street are new, and
the lots at Roskie/South Hedges and the Fieldhouse have been
re-constructed. A schedule for maintenance and repair on all existing lots is in
place.
All parking facilities are funded through
parking revenues, and the construction noted above resulted in significant and
unpopular increases in parking fees. While some dissatisfaction exists among
students, faculty, and staff, parking at MSU is within acceptable ranges of all
peer institutions for the number of parking spaces available, the cost of
parking, and the distance people must walk from their cars. Improvements and
expansion of parking will be implemented as demand, and subsequent fees
increased. [See Exhibit 8.18, Campus Parking Study.]
UTILITY ASSESSMENT
Miles of underground infrastructure (gas,
power, water, sewer) are maintained to support teaching, research, housing, and
other campus activities. An organized effort is underway to determine
the conditions of these resources and fund their renovation, maintenance, and/or
eventual replacement.
CAMPUS IRRIGATION STUDY
The University has developed a water
reservoir to hold 4.5 million gallons of water for irrigation, thereby reducing
dependence on expensive treated city water supplies. The installation of
underground sprinklers using MSU water is underway. The entire
irrigation system is currently being studied and master planned as an important
campus utility. [Exhibit 8.19, Campus Irrigation Study.]
CONCLUSIONS
A comparison of costs per square foot with MSU's peer
institutions shows that MSU's budget is significantly less for a majority of
functions, including building maintenance, custodial services, heating plant,
and landscape and grounds. Facilities Services has streamlined
operations and incorporated extensive information technology systems to manage
accounting, project, and work order data. Increasing the funding to Facilities Services
is crucial in order to protect the state's investment in the university's
physical assets, and to provide adequate levels of service for the campus
community.
Despite the success in procuring funding
for a significant stadium renovation, the state legislature has stipulated that
no operations and maintenance (O&M) funds are to be allocated for
maintenance of the stadium. Other similar new construction and renovation
continues to place added burdens on the O&M budgets of the University. For example, the
University has been able to fund two (2) new research/teaching buildings with
federal and corporate grants and private donations, but the state has funded the
O&M for these buildings at only half the needed amount.
As of January 1999 the deferred
maintenance on the central MSU campus exceeded $59,000,000, of which $43,000,000
was urgent needs threatening the capabilities of the facilities to support the
Mission of the University. This deferred maintenance does not include
the AES, nor does it include any estimates for adaptive renovation of existing
spaces. This backlog of deferred maintenance will continue to grow unless
adequate resources are provided to ensure safe, functional, and well-maintained
facilities.
The following are issues requiring
immediate attention:
· A campus-wide space utilization study should be
completed and a formal space optimization system developed and implemented to
provide the tools needed to make sound and efficient space utilization
decisions.
· A program needs to be developed for campus-wide
furniture replacement, funded on a regular basis.
· A systematic program is needed to evaluate, prioritize,
and upgrade academic equipment, and will require the establishment of adequate
equipment replacement funding.
· The Campus Design Guidelines need to be reviewed by
campus and community constituents on a regular basis.
· The Planning Design Guidelines need to be coordinated
with the University Academic Development Policy and reviewed and updated on a
regular basis making the Guidelines a continuing planning and evaluation
tool.
Issues such as
growth, fiscal constraints, aging infrastructure, land and building
preservation, and external relations with the City of Bozeman need to be taken
into consideration if this is to be a dynamic planning tool.
· The University, in conjunction with the OFS, should
develop strategies to protect and expand the O&M budget
· The implementation of a central, computerized heating,
ventilating, and air conditioning control system for all facilities, and timely
replacements of antiquated temperature control systems throughout campus, should
be made a higher priority. Poor heating and ventilation systems and
associated temperature controls represent one (1) of the sources of greatest
dissatisfaction on campus.
· Classroom maintenance and modernization should continue
to be a high priority. This includes improvements in classroom
flexibility through better instructional equipment and improvement of the
instructional environment.
· A study should be undertaken to determine the prospects
for long-range research space needs. A more comprehensive procedure should be
developed and implemented to review space and funding resources prior to offers
of employment committing existing space or requiring new facilities.
· A systematic plan needs to be developed and funded to
wire all academic buildings for high speed data delivery and to upgrade the
telephone switching gear.
· The repair, maintenance, and renovation of the AES
facilities needs to be given a higher priority.
· The project and maintenance workload handled by OFS
engineers has steadily grown, and despite significant recent improvements in
utility infrastructure, active pursuit of energy conservation grants, and
aggressive pursuit of competitive-market energy procurement, the
mechanical/electrical deferred maintenance needs continue to grow beyond
available funding. Significant utility infrastructure needs remain to be addressed.
STANDARD EIGHT - LIST OF
TABLES |
Table 8-01 |
APPA Level Ratings for Custodial
Service |
STANDARD EIGHT - LIST OF
APPENDICES |
Appendix 8-A |
Construction Query from January 1,
1990 to January 1, 1999 |
|
Appendix 8-B |
Capital Improvements Since
1990 |
|
Appendix 8-C |
2002-03 LRBP Development
Schedule |
|
Appendix 8-D |
Health and Safety Detail |
http://www.montana.edu/wwwsrm/
|
STANDARD EIGHT - LIST OF
EXHIBITS |
Exhibit 8.01 |
1999 MSU Property Appraisal |
|
Exhibit 8.02 |
MSU ADA Self-Evaluation and
Transition Plan |
|
Exhibit 8.03 |
MSU Long Range Building
Program |
|
Exhibit 8.04 |
1995 Administrative Services
Review |
|
Exhibit 8.05 |
Office of Facilities Services
Organizational Chart |
http://www.montana.edu:80/wwwpp/ |
Exhibit 8.06 |
Position Descriptions for Facilities
Services Key Personnel |
|
Exhibit 8.07 |
Resumes of Facilities Services
Professional Staff |
|
Exhibit 8.08 |
Facilities Condition
Inventory |
|
Exhibit 8.09 |
CADD Standards |
|
Exhibit 8.10 |
Property Management |
http://www.montana.edu:80/wwwprpty/ |
Exhibit 8.11 |
SUB Space Study |
|
Exhibit 8.12 |
Facilities Inventory |
|
Exhibit 8.13 |
University Facilities Planning
Board |
http://www.montana.edu/aircj/coms/ufpub.html |
Exhibit 8.14 |
Campus Design Guidelines |
|
Exhibit 8.15 |
Campus Master Planning Charrette
Report |
|
Exhibit 8.16 |
Campus Lighting Study |
|
Exhibit 8.17 |
Campus Open Space Study |
|
Exhibit 8.18 |
Campus Parking Study |
|
Exhibit 8.19 |
Campus Irrigation Study |
|
CAPITOL IMPROVEMENT PROJECTS ON
DISPLAY IN EXHIBIT ROOM |
Project |
Displays |
Ag BioSciences Building |
Contract Documents,
Renderings |
Engineering/Physical Sciences
Building |
Contract Documents,
Renderings |
EpiCenter Pilot Project |
Schematic Drawings |
Family Housing - McIntosh
Court |
Survey, Contract Documents |
Fieldhouse Renovation |
Contract Documents,
Renderings |
Heating Plant Renovation |
Contract Documents |
Library |
LRBP Proposal for Renne Library
Renovation, Rendering of Reading Room |
New Residence Halls |
Survey, Contract Documents |
Stadium Renovations Phase I and
II |
Contract Documents,
Renderings |
Utility Tunnel - Centennial
Mall |
Contract Documents, Renderings,
Model |