Mud Springs
Mud Springs Phase I - Pryor Cave Wind
Rated Power |
80 MW |
---|---|
Turbine Quantity | 32 |
Online Date | - |
Owner | EverPower Wind Holdings |
Operator | EverPower Wind Holdings |
Developer | Mud SPrings Wind LLC |
Manufacturer |
Siemens Gamesa |
---|---|
Model | G114 |
Nameplate Capacity | 2500 kW |
Rotor Diameter | 114 m |
Hub Height | 100 m |
Rated Wind Speed | 10 m/s |
For More Information:
- https://everpower.com/mud-springs-mt/
- http://co.carbon.mt.us/wp-content/uploads/2016/10/Mud-Springs-NE-Pryor-Cave-Res-2016-24.pdf
- http://www.jsbmarketresearch.com/construction/everpower-mud-springs-wind-farm-240-mw-montana-project-profile
Mud Springs Phase II - Mud Springs Wind
Rated Power |
80 MW |
---|---|
Turbine Quantity | 32 |
Online Date | - |
Owner | EverPower Wind Holdings |
Operator | EverPower Wind Holdings |
Developer | Mud SPrings Wind LLC |
Manufacturer |
Siemens Gamesa |
---|---|
Model | G114 |
Nameplate Capacity | 2500 kW |
Rotor Diameter | 114 m |
Hub Height | 100 m |
Rated Wind Speed | 10 m/s |
For More Information:
- https://everpower.com/mud-springs-mt/
- http://co.carbon.mt.us/wp-content/uploads/2016/10/Mud-Springs-NE-Mud-Springs-Res-2016-23.pdf
Mud Springs Phase III - Horse Thief Wind
Rated Power |
80 MW |
---|---|
Turbine Quantity | 32 |
Online Date | - |
Owner | EverPower Wind Holdings |
Operator | EverPower Wind Holdings |
Developer | Mud SPrings Wind LLC |
Manufacturer |
Siemens Gamesa |
---|---|
Model | G114 |
Nameplate Capacity | 2500 kW |
Rotor Diameter | 114 m |
Hub Height | 100 m |
Rated Wind Speed | 10 m/s |